Title
Rough Country 2 Inch Lift Kit 52 Inch RR Springs | Chevy Half-Ton Suburban/K5 Blazer (88-91)
2 Inch Lift Kit | 52 Inch RR Springs | Chevy Half-Ton Suburban/K5 Blazer (88-91)
Fitment Notes
- ONLY fits models with 52" rear leaf springs.
- If vehicle is equipped with a front sway-bar, drop brackets are recommended. (SKU: 1019)
- Vehicles with factory quad shocks (2 front shocks per side) will simply use a single aftermarket shock.
What's In The Box
Front:
- Lifted leaf springs
- U-bolts
- Hardware
Rear:
- Lifted leaf springs
- U-bolts
- Hardware
Shocks:
- (4) Premium N3 series
Specifications
- Est. Install Time: 6 - 8 hours
Fitment Notes
- ONLY fits models with 52" rear leaf springs.
- If vehicle is equipped with a front sway-bar, drop brackets are recommended. (SKU: 1019)
- Vehicles with factory quad shocks (2 front shocks per side) will simply use a single aftermarket shock.
What's In The Box
Front:
- Lifted leaf springs
- U-bolts
- Hardware
Rear:
- Lifted leaf springs
- U-bolts
- Hardware
Shocks:
- (4) Premium N3 series
Specifications
- Est. Install Time: 6 - 8 hours
2 Inch Lift Kit | 52 Inch RR Springs | Chevy Half-Ton Suburban/K5 Blazer (88-91)
Fitment Notes
- ONLY fits models with 52" rear leaf springs.
- If vehicle is equipped with a front sway-bar, drop brackets are recommended. (SKU: 1019)
- Vehicles with factory quad shocks (2 front shocks per side) will simply use a single aftermarket shock.
What's In The Box
Front:
- Lifted leaf springs
- U-bolts
- Hardware
Rear:
- Lifted leaf springs
- U-bolts
- Hardware
Shocks:
- (4) Premium N3 series
Specifications
- Est. Install Time: 6 - 8 hours
Fitment Notes
- ONLY fits models with 52" rear leaf springs.
- If vehicle is equipped with a front sway-bar, drop brackets are recommended. (SKU: 1019)
- Vehicles with factory quad shocks (2 front shocks per side) will simply use a single aftermarket shock.
What's In The Box
Front:
- Lifted leaf springs
- U-bolts
- Hardware
Rear:
- Lifted leaf springs
- U-bolts
- Hardware
Shocks:
- (4) Premium N3 series
Specifications
- Est. Install Time: 6 - 8 hours
By changing our most important processes and
products, we have already made a big leap forward. This ranges from the
increased use of more sustainable fibers to the use of more
environmentally friendly printing processes to the development of
efficient waste management in our value chain.